“STUDI PENGGUNAAN METODE TIME COST TRADE OFF UNTUK PERCEPATAN WAKTU PADA PROYEK PEMBANGUNAN JEMBATAN DAN OPRIT BOULEVARD II”. 2024. Jurnal Sains Dan Teknologi 4 (1): 1-6. https://doi.org/10.70524/ncb9s624.